Pika T701

Pika T701 Certification Documents
- Power Performance Report pp.1-17, August, 2015
- Power Performance Report p.18, August 2015.
- Power Performance Report pp.19-28, August 2015.
- Power Performance Report Appendices, August 2015
- Draft Acoustic Report, 18 November, 2015
- Safety and Function Report, 15 January, 2016
- Draft Duration Report, 18 November, 2015
- Loss-of-load shutdown in high wind,8 May, 2015 video.
- Inverter-commanded shutdown in high wind: 8 May, 2015. video.
Note: the power performance report as a single file can be obtained on email request of Ruth Douglas Miller; see main page for contact information.
Return to High Plains Test Center main page.